Nov 15, 2012

Entrance area - walkpath

We are getting there. Eline and Karoline tried it out and concluded that its "walkable" :-)

Also the doors and windows for the basement arrived and are now stored in a dry place.

Nov 11, 2012

Laying floors: Checkmark!

This weekend we finished laying the floor. Its now left to put on the lists on the roof, the floor and putting in the door frames. The tiling in the big bathroom is done as well. Now we need to do the grouting and hopefully the plumber comes soon to finish off.

Outside we were able to do some foundation work on the balcony pillars and continued the walk path to the entrance area.

Nov 6, 2012

Painting: Checkmark!

Everything has been painted now inside. The weather was so nice this weekend that we could do some outside work - cleaning up the area and collected all the materials that got scattered around by the storm and continuing the work on the entrance area.