Jun 11, 2012

Concrete

It was raining a little bit today but fortunately it was not so much that todays work was in danger. A little after 12 o'clock today the pumping truck came to pump the concrete into the foundation we prepared the last days. Shortly after 3 more trucks arrived with the concrete.

The pumping truck arrives

Preparations for the pumping

The first truck with concrete

The pump is being put into place

The concrete starts to pour

First we took the outer rim so the concrete could set a little bit

Afterwards the hard work started to distribute everything evenly



And this is how it looks in the end - nice and smooth


Foundation for the balcony pillars
To prevent the surface from drying out and make the concrete crack we sprayed it with some liquid plast. And in the end we put in reinforcements for the walls and the pillars for the balcony.
The foundation with the reinforcement for the outer wall